We recently did a meth job where one room was lined with unsealed MDF and varnish wood shelving and so the recommendation was to strip out the room, I used this as an opportunity to trial the product. The timber was sampled after 1 day of drying and the results were impressive considering the quickness of the process. The labour saving would be a big factor because of the 4 hours required for the HP based solutions to be effective.
Sean Johnson
Restore, Decontamination Experts